The Difference Between day(this) in Legacy Calendars and Custom Calendars

With the introduction of Flexible Time Modeling in Release 2017.2, the use of day(this) within formulas gets interpreted differently depending on if your instance has a legacy calendar or a custom calendar. Legacy calendars are calendars created before Release 2017.2 that have not been changed within Time Administration.

The easiest way to determine if your calendar is legacy is to view the Time Administration's toolbar. Only legacy calendars have the extend backward and forward buttons extendBackward.png extendForward.png

Legacy Calendar Time Administration Toolbar Custom Calendar Time Administration Toolbar
Legacy Calendar Time Administration Toolbar Custom Calendar Time Administration Toolbar

Legacy calendars interpret the day(this) function as the number 15.

If you change your legacy calendar by lengthening it, changing its labels, or adding or removing time strata, it becomes a custom calendar. Any Adaptive instances created after Release 2017.2 automatically operate as custom calendars by default, even though they're monthly. While legacy calendars always return the number 15 for day(this), custom calendars interpret day(this) as the day integer of the first date of the containing time period.

day(this) in a Legacy Calendar day(this) in a Custom Calendar
Legacy use of day(this) Custom Calendar day(this)
return value for January 2016 = 15 return value for January 2016 = 1

For example, in a custom calendar configured with weeks, if week 1 of a year begins January 1, using day(this) in week 2 returns the number 8. 

Custom Calendar - week 2 - day(this)

January 8 is the first day of week 2.

day-this-calendar-week2.png

How (this) is Interpreted in a Comparison Within an IF statement 

For legacy calendars, the word (this) within a formula can represent the 15th of any month when it is used as a comparison in an IF statement.

In a custom calendar (this) represents the start date of a time period.

For example, the formula IF(this>toDate(2016,1,1),1,0) will return a 1 in a legacy calendar that starts in January 2016. In a custom calendar, the formula returns a 1 starting in February 2016.

In January 2016 of a legacy calendar, (this) means 1-15-2016, and in a custom calendar (this) means 1-1-2016.

IF(this>toDate(2016,1,1),1,0) January 2016 February 2016
Legacy result = 1 result=1
Custom result=0 result=0

How to Edit day(this) Formulas from Legacy Calendars for Use in New Calendars

There are two steps to take to ensure your formulas produce expected results when you use them in custom calendars or Adaptive instances created after Release 2017.2. 

  1. Within all formulas, replace all instances of day(this) in a legacy calendar with the number 15.
  2. Within an IF statement in a legacy calendar replace the word (this) with toDate(this.year,this.month,15).

 

  • Was this article helpful?